Everything from a single source
Highest quality & precision
Technologically leading
On site for you worldwide

Maintenance contract Cleaning Line CR266

incl. 24/7 hotline service & 24-months warranty
 
brand new

The service and maintenance contract provides for a preventive maintenance interval of two years to ensure the best possible process safety and reliability of the CR266. Critical components, wearing parts and filters are replaced once a year or as required by the customer. We grant a 24-month warranty on all replaced components except wear parts. Telephone support is free of charge during this period.
Item no.: 37263
Add to favorites

Maintenance is carried out every two years by a CemeCon service technician on site at the customer's premises. Maintenance includes an inspection of the entire machine in accordance with the maintenance schedule:
 
  • Checking the switch cabinet-Checking the tank heaters
  • Replacement of pump head P8
  • Replacement of osmosis membrane and a pressure and flow check
  • Replacement of the spray arm
  • Replacement of all spray nozzles
  • Replacement of the chamber heaters and temperature sensors
  • Replacement of non-return valves on the working chamber
  • Checking the gear racks and gear wheels of the door drive
  • Check conductivity meter
  • Function test of all valves and replacement of all process ball valves
  • Replace pump P2 main pump
  • Internal inspection of all tanks, cleaning if necessary
  • Replacement of all tank seals
  • Replace door seal of working chamber
  • Check spray hoses; minor repair/replacement if necessary (max. 1 hour)
  • Replace filter, water inlet 2x, activated carbon, city water tank and demineralized water circuit
  • Replacement of the chamber ventilation air filter
  • Replacement of UV lamps for disinfection in VE water circuit
  • Checking the cooling system using pressure indicators in the operating theater and chart
  • Vacuum check; reading out the chart; manual check
  • Filling the system with water
  • Subsequent function check with test run
  • Filling the system with caustic solution and titration (if available at the customer's premises)
  • Preparation of a maintenance report
  • Discussion/advice on any further repair/replacement measures that may be necessary

If it is not yet necessary or not desired to replace the component, the components that have not been replaced will remain with you.

Properties
Technical data
Type CR266